Water Rights & Regulations

Irrigation scheduling worksheet

Scheduling replaces calendar guesses with a running water balance that tells you when the soil will run low.

The checkbook idea

Think of soil as a bank account for water. Rain and irrigation are deposits. Crop evapotranspiration is a withdrawal. The checkbook method tracks the balance and signals when to irrigate before the crop is stressed. It works with a simple spreadsheet or paper form and can be checked with soil probes or sensors.

Inputs to set up

  • Field, crop and planting date
  • Root zone depth for the growth stage
  • Soil water holding capacity in inches per foot, from soil maps or lab data
  • Management allowed depletion, often around 40 to 50 percent for many crops
  • Irrigation system capacity and net application depth
  • Source of daily ET and rain data

Worked example

Suppose the root zone is 3 feet and the soil holds 1.6 inches per foot, so total available water is 4.8 inches. At 50 percent depletion, you should irrigate when 2.4 inches have been used. With crop ET of 0.25 inch per day and no rain, that threshold arrives in about ten days. If your pivot applies 0.8 inch net per pass, you will need several passes or a slower speed to refill the root zone, depending on the system.

Daily or weekly entries

Record the date, ET, rainfall, effective rainfall, irrigation applied and new soil water balance. Rain over about half an inch may be partly lost as runoff, so many schedulers count only a share of small or heavy events. Recheck the balance with a soil probe or sensor every week and adjust.

Avoiding common errors

  • Using a reference ET without a crop coefficient
  • Ignoring irrigation system efficiency
  • Applying more than the soil can hold, which wastes water and leaches nutrients
  • Letting the balance run to wilting point in critical stages such as tasseling or flowering

Adjusting for the system

Check how much water your system actually puts on the ground by running a catch-can test. If a pivot applies less than its rated depth because of wind or leaks, your schedule will drift. Update the depth in the worksheet whenever you change nozzles, speeds or pressure settings.

Pair with other records

Use the evapotranspiration data log and soil moisture checklist for inputs. Save the sheet to support the annual report. For a farm.FM story about whether schedules ever hold, see Irrigation Scheduling Cancels Thursday.

Official sources to verify

Confirm rules, dates and fees with the issuing agency before you act.