Water Rights & Regulations

NRCS water management practice study

NRCS offers technical help and cost-share for practices that save water, but the process starts with understanding what is available.

What NRCS can do

The Natural Resources Conservation Service, part of USDA, provides free conservation planning help to farmers and ranchers and administers financial assistance programs. Water management practices include irrigation water management, sprinkler and microirrigation system conversions, pipeline, ditch lining, water control structures, tailwater recovery, pumping plant upgrades and livestock water facilities. Each practice has a national standard, adapted to local conditions.

Learn the practice standards

Start with the practice standard for Irrigation Water Management, listed as practice code 449. It describes the purpose, conditions where it applies, criteria and considerations. Read the standard for any practice you are interested in, and note the minimum requirements that must be met to qualify. NRCS field offices can explain which practices are used locally.

Programs and eligibility

Cost-share is generally offered through programs such as the Environmental Quality Incentives Program, subject to funding, ranking and eligibility. Applications are often ranked and funded in batches. Ask about sign-up dates, eligibility for beginning, veteran or underserved farmers, and payment limits. Understand that you typically must not start a practice before the contract is approved unless a waiver applies.

Prepare for a planning visit

  • Bring maps, aerial photos and field boundaries
  • Share water rights, well data and meter records
  • List concerns such as high energy bills, runoff or aging equipment
  • Describe your goals for yield, labor and water savings
  • Bring records of irrigation system type, age and condition

Questions to ask

  • Which practices fit my system and soils?
  • What are the payment rates and caps?
  • How will water savings be measured?
  • What are the operation and maintenance requirements and the contract length?
  • Will this affect my water right or allocation?

That last question matters. Efficiency changes can alter return flows, as covered in the return flows guide.

Timing the application

Contact the service center before the sign-in period, not during it, because planners can help you gather maps and records in advance. Ask how many years the contract lasts and whether practices may be phased. Do not buy equipment before the contract is approved, because costs incurred early may not be reimbursed.

Keep a record

Document each conversation, application and approval. Save the conservation plan and practice job sheets. Use service center contact preparation to get ready. For a farm.FM story about smart agricultural technology, see Smart Soil: The Agricultural Marvel of Our Times.

Official sources to verify

Confirm rules, dates and fees with the issuing agency before you act.