Point-of-diversion change research
Even moving a pump a few hundred feet along a stream can alter who is affected, which is why agencies review it.
What the change involves
The point of diversion is the location where water is taken, such as a headgate, pump site or well. Changing it may mean moving a ditch intake upstream, drilling a replacement well, shifting a pump to a new site or consolidating several diversions. Many states require approval for any change, even when the quantity, purpose and place of use stay the same.
Why the location matters
Streams gain and lose water along their length, and the effects of a diversion fall on users located between the old and new points. Moving upstream may reduce water for those in between, while moving downstream may affect instream flow or senior users above. For wells, moving farther from a stream or closer to a neighbor's well may change interference. A hydrologic review is often needed.
Information to prepare
- Exact coordinates and legal descriptions of the old and new points
- Maps showing stream reaches, other diversions and wells nearby
- Description of structures, pump size and conveyance
- Rate and volume of the right, and any changes proposed
- Evidence that the right is valid and has been used
- Easements or permission for access to the new site
Questions for the agency
Ask what standard applies to a minor relocation versus a major one, whether a replacement well keeps its priority date, whether notice to neighbors is required and how long protest periods last. Ask whether any construction permits are needed, such as for work in a stream channel, which may involve state and federal agencies.
Cost and risk
Costs include application fees, surveys, engineering studies and construction. Risks include protests, conditions that limit rate or volume and delays that affect the season. Never build the new diversion before approval unless the agency has said you may.
Protecting access
Before you invest in a new site, confirm that you hold an easement or ownership for the headgate, the pipeline route and the access road. A permit for a new diversion does not give you the right to cross a neighbor's land. Record the easement with the county and note it in your inventory.
Document everything
Keep copies of the application and approval. Update the stream diversion point map and your document inventory. For a farm.FM story about drilling and drainage, see Ohio Weighs Letting Utilities Build Before Farmers Get a Hearing.
Official sources to verify
Confirm rules, dates and fees with the issuing agency before you act.