Surface water diversion permit checklist
Applying for a new surface water right is a detailed process, and a complete application is the best way to avoid delay.
First: is water available?
In many western basins, rivers are fully appropriated or closed to new rights, meaning that a new permit may not be possible. Ask the agency whether the source is open, whether there are seasonal limits and whether there are other ways to obtain a right, such as buying or leasing an existing one. Check streamflow records to see if water is available when you need it.
Core application items
- Applicant name, address and landowner information
- Source of water and tributary
- Point of diversion with coordinates and legal description
- Amount requested as a flow rate, volume or both
- Purpose of use, place of use and acreage
- Season of use
- Description of diversion works, such as headgate, pump or pipeline
- Maps and engineering drawings
- Fees and signatures
Supporting evidence
Agencies may ask for proof that the proposed use is beneficial, that the amount is reasonable for the acres and crop, and that the project is feasible. Include crop water calculations from the seasonal crop water needs worksheet. Submit land ownership documents or easements for the diversion and conveyance route.
Notice and protest
Most states require public notice, and neighbors or other water users may file protests if they believe the new right will injure them. Ask how notice is given, how long protests may be filed and how disputes are resolved. Talk to nearby users before filing, as early communication can reduce conflict.
Permit conditions
If approved, the permit may include conditions such as measuring devices, bypass flows for fish, seasonal restrictions and reporting. It will also set deadlines to build the diversion and put water to use. Missing these can cancel the permit.
After construction
Keep records of construction dates and first use. Submit proof of beneficial use if required, which may lead to a certificate. Consult the beneficial use documentation guide. Calendar every deadline in the permit, including construction start, completion and proof of use, as soon as it is issued.
Additional approvals
Work in a stream channel may need local, state or federal approvals, and dams may need safety review. For a farm.FM story about waiting for permission, see Rodeo Paperwork Rodeo: Navigating the Wild World of Bull Riding Regulations.
Official sources to verify
Confirm rules, dates and fees with the issuing agency before you act.