Well construction record checklist
The construction record is the well's birth certificate, and it explains much of how the well will perform and age.
Why the record matters
A well's depth, casing, screen and seal determine what aquifer it taps, how it can be repaired and how well it protects against contamination. When pump problems or water quality issues arise years later, the construction record often points to the cause. It also helps agencies assign the well to the correct permit, and buyers ask for it.
Items the record should show
- Owner, location and permit or registration number
- Driller name, license number and completion date
- Total depth drilled and depth completed
- Borehole diameter and casing diameter, material and thickness
- Depth and length of well screen or open interval
- Grout or annular seal type and depth
- Gravel pack, if used
- Geologic log with layers of clay, sand, gravel or rock
- Static water level at completion
- Pump test results: rate, drawdown and duration
- Disinfection and sanitary cap details
Reading the numbers
Compare the screened interval with the geologic log to see which layers supply water. Check the grout depth, since a shallow or missing seal can allow surface water down the outside of the casing. Look at the specific capacity, which is yield divided by drawdown. A decline in specific capacity over time suggests screen clogging or aquifer changes. If the record is missing information, note it.
Where to get the record
Request a copy from the state agency, which keeps driller reports for many wells. If the well is old, the agency may have only a partial record. Ask the former owner and the driller, if still in business. The driller verification guide helps check credentials.
Add your own information
Record repairs, pump replacements, cleaning, water level measurements and test results over time. Attach photographs of the wellhead, cap and surrounding area. Keep the records with the well inventory.
Using the record for repairs
Give a copy to any pump installer or driller before work begins, since casing diameter, screen depth and static level determine what equipment fits. Note the pump setting depth after each repair, and update the record. A well file that grows with the well saves time and money at every service call.
When there is no record
For undocumented wells, a licensed contractor can use a camera inspection to determine depth, casing and condition. For a farm.FM story about records, see USDA Says Its Corn Forecast Is Right.
Official sources to verify
Confirm rules, dates and fees with the issuing agency before you act.